Exeon were asked to provide a technical proposal for Ventilation & Odour control for the Temporary Bulky waste facility at London Energy, part of the Ecopark upgrade project.
The facility was designed to handle Municipal waste for 12-18 months whilst the Ecopark project was in progress.
The installation was required to be completed within 6 months to allow the waste flow to continue uninterrupted.
The installation was initially required to achieve a low level of odour units (1,500ou/m3) at discharge. There was concern this stringent level would result in short bed life.
Exeon ran odour models to ensure optimal stack height, discharge velocities & odour control bed depth, to ensure the optimal bed life was achieved.
Exeon also recommended and installed dust filters to preserve the life of the carbon media.
Exeon worked with the design and install team and successfully completed the installation ahead of schedule in a very tight installation window.
£700,000