Skip to content
ExeonExeon
  • Specialists in Design, Supply & Installation of Dust & Odour Control Systems
  • Call Us
  • Contact Us
  • Home
  • About
    • About Us
    • Mission & Values
    • Accreditations
    • Charity Work
  • Odour &
    Emissions
    • Activated Carbon Adsorption
    • Activated Carbon – What is it?
    • Scrubbers
    • Exeon Stacks
    • Biofilter Odour Control
  • Dust Extraction
  • Industrial Ventilation
  • Industry
    Case Studies
    • Abattoir
    • Energy Recovery
    • Food Processing
    • Plastics
    • Waste Handling
    • Waste Water
  • The Exeon Range
    • Nodour Range
    • WX Wet Scrubber
    • Biofilter Odour Control
  • Services
    • Design
    • Odour Extraction System Installation
    • Consultancy
  • Knowledge Centre
    • Brochures
    • Videos
    • Duct Diameter Calculator
Waste Handling

Odour Abatement for Waste Transfer Plant

Issue

The Neath Port Talbot County Council was looking to reconfigure the existing MREC site to process domestic and commercial waste. Upgrade of the existing dust filter system to an Odour and Abatement system was also required as part of these works.

The installation was required to achieve 1,500ou/m3 at discharge. To meet BAT (best available techniques), carbon deep-bed adsorption was required. It was also important that Carbon monoxide fumes from the excavators were controlled for internal air quality requirements.

The installation was required to be carried out within a 6-month window, including a 20day shutdown of the waste processing area where the old system was required to be changed to the new.

Solution

Exeon supplied and installed an Odour & abatement system to control dust to 5mg/Nm3 and odour to within 1,500odour units per m3 (ou/m3). Initial odour readings at discharge were 150ou/m3.

CFD Models (computational fluid dynamics) were run to determine airflows within the building. Exeon supplied and installed Extract ducting and supply air grills / fans to ensure the required air changes were achieved across the building.

The installation was completed within a 6 month period and the 20day shutdown was negotiated successfully.

Project Value

£600,000

Download as a PDF Contact for a quote

Kemsley Power Station – EFW Plant
Odour Abatement System for Waste Facility

    REQUEST A CALLBACK


    Exeon provides clean air solutions across a wide range of industrial, educational and commercial applications.

    GROUP POLICIES
    ACCESSIBILITY STATEMENT

    Industry Case Studies
    • Abbatoir
    • Energy Recovery
    • Waste Water
     
    • Food Processing
    • Plastics
    • Waste Handling
    Contact Details

    Address:
    Exeon Ltd, Lyric House, Blackhorse Road,
    Letchworth, SG6 1HB

    Email: sales@exeon.co.uk

    Phone: 01462 410010


    Copyright 2025 Exeon® Ltd | All rights reserved | Exeon Ltd is a Company Registered in England and Wales (Company No. 10886824) | Terms & Conditions | Website by Freshpage
    • Home
    • About
      • About Us
      • Mission & Values
      • Accreditations
      • Charity Work
    • Odour &
      Emissions
      • Activated Carbon Adsorption
      • Activated Carbon – What is it?
      • Scrubbers
      • Exeon Stacks
      • Biofilter Odour Control
    • Dust Extraction
    • Industrial Ventilation
    • Industry
      Case Studies
      • Abattoir
      • Energy Recovery
      • Food Processing
      • Plastics
      • Waste Handling
      • Waste Water
    • The Exeon Range
      • Nodour Range
      • WX Wet Scrubber
      • Biofilter Odour Control
    • Services
      • Design
      • Odour Extraction System Installation
      • Consultancy
    • Knowledge Centre
      • Brochures
      • Videos
      • Duct Diameter Calculator
    • -
    • -
    • Contact Us

      Need Technical Support?

      Fill in the contact form below to book a free teams call with one of our technical sales team!


      X
      Need Help? Book a FREE teams meeting now!